Building Regulations Part M: Non-HRB Domestic Compliance Guide for Small Practices

Approved Document M — Access to and Use of Buildings (Volume 1: Dwellings) · Building Safety Act 2022 · Non-HRB projects

Summary

What the Building Safety Act requires for Part M on non-HRB domestic jobs

For new dwellings the baseline is M4(1): a reasonably level approach from the boundary or parking space, an accessible (nominally flush, ≤15 mm) principal entrance threshold, a WC at entrance level (or the first habitable storey where there is none), and internal door clear widths from Table 1 of AD M Volume 1 — 750 mm head-on, up to 900 mm where approached at an angle from a 900 mm corridor.

M4(2) and M4(3) only apply where a planning condition invokes them, but where they do, they are Building Regulations requirements in full: as Principal Designer (BSA) your first Stage 1 action on any new dwelling is to read the decision notice and record which category applies. Discovering an M4(2) condition at Stage 4 means redesigning stairs, bathrooms and door swings.

The accessible threshold is the detail where Part M collides with Parts C and L: flush access, damp-proofing and thermal continuity at the same junction. That threshold detail — drawn, not assumed — is a signature piece of PD coordination evidence on every new dwelling.

Key design risks and evidence needed (RIBA Stages 2–4)

Standards and references you should be citing

Minimum clear door widths — M4(1) visitable dwellings

ApproachCorridor widthMinimum clear door width
Straight-on900 mm750 mm
At an angle900 mm900 mm
At an angle1,050 mm775 mm
At an angle1,200 mm750 mm

Common pitfalls that catch out sole practitioners

Frequently asked questions

Does Part M apply to a domestic extension?

Extensions to existing dwellings do not have to meet the new-dwelling access standards, but the work must not make the building less compliant than before — for example, removing the entrance-level WC or blocking the accessible entrance. Record the 'no worsening' check in your tracker.

How do I know if a new house must be M4(2) or M4(3)?

Only from the planning permission: these optional requirements apply solely where a planning condition imposes them. Check the decision notice at Stage 1, record the applicable category, and design to it from first layouts — retrofitting M4(2) into a finished plan is a redesign, not a tweak.