Building Regulations Part A: Non-HRB Domestic Compliance Guide for Small Practices

Approved Document A — Structure · Building Safety Act 2022 · Non-HRB projects

Summary

What the Building Safety Act requires for Part A on non-HRB domestic jobs

Requirement A1 (loading), A2 (ground movement) and A3 (disproportionate collapse) apply to every extension, loft conversion and structural alteration, however small. Since the Building Regulations etc. (Amendment) (England) Regulations 2023 came into force on 1 October 2023, the Principal Designer under the Building Safety Act 2022 must plan, manage and monitor the design work so that, if built, it would comply with all relevant requirements — Part A included.

In practice that means you cannot simply pass structure to a consulting engineer and forget it. As PD you should record who is designing each structural element, confirm the engineer's competence, and hold the calculation package, beam schedules and connection details in your project evidence log so you can demonstrate coordination if Building Control or a future purchaser's solicitor asks.

For domestic clients, remember that if no PD is formally appointed in writing, the duties default to the designer in control of the design phase — usually you. An unmanaged Part A trail is exactly the kind of gap that surfaces when a cracked lintel becomes a claim.

Key design risks and evidence needed (RIBA Stages 2–4)

Standards and references you should be citing

Evidence log: what Building Control expects vs what protects you

ElementMinimum for Building ControlWhat a defensible PD evidence log holds
Steel beams / lintelsEngineer's calcs with applicationCalc revision history, padstone details, drawing cross-references, engineer's PI confirmation
FoundationsDepth agreed on site with inspectorTrial pit/soil notes, tree survey, agreed depth recorded with date and inspector name
Wall ties & restraintNoted on drawingsBS EN 845-1 specification clause plus site photo evidence at construction stage
Removed wallsBeam calcLoad-path sketch, temporary works note, party wall award reference where relevant

Common pitfalls that catch out sole practitioners

Frequently asked questions

Do I need structural calculations for a single-storey domestic extension?

Almost always yes for any new openings, beams or lintels beyond simple catalogue lintels within their published span tables. Building Control will expect calculations to BS EN Eurocodes or BS 8103 for beams, and the Principal Designer (BSA) should hold them in the project evidence log with drawing cross-references.

As the architect, am I responsible for Part A if a structural engineer designs the structure?

The engineer is responsible for their design as a designer under the BSA 2022, but if you are the Principal Designer you retain the duty to plan, manage, monitor and coordinate design work so the project as a whole complies. You should record the engineer's scope, competence and outputs — coordination is your evidence, not theirs.

Does Part A apply differently to non-HRB buildings?

The functional requirements are the same, but non-HRB projects avoid the Gateway 2/3 approval process entirely. Compliance is demonstrated through your chosen Building Control route, supported by the design evidence the PD coordinates.