Building Regulations Part D: Non-HRB Domestic Compliance Guide for Small Practices

Approved Document D — Toxic Substances · Building Safety Act 2022 · Non-HRB projects

Summary

What the Building Safety Act requires for Part D on non-HRB domestic jobs

Requirement D1 states that if insulating material is inserted into a cavity wall, reasonable precautions must be taken to prevent permeation of toxic fumes into occupied parts of the building. In modern practice this targets urea formaldehyde foam: the inner leaf must provide a continuous barrier and the wall must be assessed as suitable before filling.

For the Principal Designer (BSA) on a domestic refurbishment or extension the duty is proportionate: confirm what insulation is being injected or installed, check it holds third-party certification for the wall construction in question, and log it. Where your thermal upgrade strategy under Part L involves retrofit cavity fill, Part D is the companion check that stops it becoming an indoor air quality problem.

Where existing UF foam is found during opening-up works, record its condition and any advice given — disturbed historic foam is an occasional source of formaldehyde odour complaints.

Key design risks and evidence needed (RIBA Stages 2–4)

Standards and references you should be citing

Part D at a glance

ScenarioPart D actionEvidence to log
New cavity walls with built-in insulationStandard products — no UF issueProduct spec entry; mark Part D 'considered, low risk'
Retrofit injected cavity fillSuitability assessment + certified systemBBA certificate no., installer declaration, CIGA guarantee
Historic UF foam discoveredAssess condition, advise clientSite note and advice record

Common pitfalls that catch out sole practitioners

Frequently asked questions

Is Part D still relevant if nobody uses urea formaldehyde foam any more?

Yes, in two ways: it still applies where any insulating material is inserted into a cavity (so your specification and certification trail is the compliance evidence), and UF foam does survive in the existing housing stock, where it can be disturbed by alteration works. A short, dated entry in your requirements tracker closes it either way.

Does Part D cover asbestos found during a refurbishment?

No. Asbestos is managed under the Control of Asbestos Regulations 2012 and your CDM 2015 duties (pre-construction information, surveys). Part D is limited to fumes from cavity insulation. Record asbestos findings in your CDM documentation instead.