Building Regulations Part E: Non-HRB Domestic Compliance Guide for Small Practices

Approved Document E — Resistance to the Passage of Sound · Building Safety Act 2022 · Non-HRB projects

Summary

What the Building Safety Act requires for Part E on non-HRB domestic jobs

Requirement E1 sets performance standards for separating walls and floors between dwellings: for new build, minimum 45 dB DnT,w+Ctr airborne and maximum 62 dB L'nT,w impact; for material change of use (flat conversions), 43 dB airborne and 64 dB impact. Requirement E2 sets a lab-tested 40 dB Rw standard for new internal walls and floors within a dwelling, and E3 covers reverberation in common parts.

As Principal Designer (BSA), your job is to fix the compliance route early and protect the tested build-up from value engineering. A separating floor that passes on paper fails on site when the resilient layer is swapped or a downlight punctures the ceiling — and the retest plus remedial works come out of someone's margin, with the paper trail deciding whose.

House extensions rarely engage E1, but a loft conversion in a semi-detached house abuts the party wall: upgrading the separating wall lining in the new roofspace is frequently required and frequently missed.

Key design risks and evidence needed (RIBA Stages 2–4)

Standards and references you should be citing

Compliance routes compared

RouteApplies toEvidence to log
Robust DetailsNew attached dwellings onlyRD registration certificate (pre-start), build-up spec, site photos of key junctions
Pre-completion testingConversions; new build where RD not usedUKAS test certificates per element group, tested build-up spec
E2 internal elementsAll new internal walls/floors in dwellingsLab performance data for the specified build-up (40 dB Rw)

Common pitfalls that catch out sole practitioners

Frequently asked questions

Does a house extension need sound testing?

Normally no — testing applies to separating walls and floors between dwellings (E1). But new internal walls and floors within the dwelling must meet the E2 laboratory standard of 40 dB Rw, which you evidence through the specified build-up rather than a site test.

When is pre-completion testing mandatory?

For material change of use creating dwellings (flat conversions) always, and for new attached dwellings unless the separating constructions are registered Robust Details before work starts. Tests are done by a UKAS-accredited body on a sample of plots/rooms as set out in Approved Document E.