Building Regulations Part S: Non-HRB Domestic Compliance Guide for Small Practices

Approved Document S — Infrastructure for the Charging of Electric Vehicles · Building Safety Act 2022 · Non-HRB projects

Summary

What the Building Safety Act requires for Part S on non-HRB jobs

For a new dwelling with associated parking within the site boundary, Part S requires installation of at least one charge point per dwelling with parking. The charge point must be at least 7 kW, comply with BS EN 61851, and — under the Electric Vehicles (Smart Charge Points) Regulations 2021 — be a smart charge point with the mandated functionality.

Residential buildings undergoing major renovation with more than 10 parking spaces must provide charge points and cable routes; dwellings created by material change of use with associated parking are also in scope, subject to the £3,600 cost-cap exemption per charge point (where the cost exceeds the cap, cable routes suffice). Each exemption used must be evidenced, not assumed.

As Principal Designer (BSA), the coordination points are electrical capacity (a 7 kW charger is a 32 A continuous load — see Part P), charge point location relative to the parking space and the consumer unit, and the completion documentation: the charge point's installation certificate and smart functionality declaration belong in the handover pack alongside the EIC.

Key design risks and evidence needed (RIBA Stages 2–4)

Standards and references you should be citing

When Part S bites on small projects

ProjectRequirementEvidence to log
New house with driveway1 charge point, ≥7 kW, smartInstallation certificate + smart declaration
New flat block, parking on siteCharge point per dwelling with parking (cost cap may apply)Charge point schedule, exemption evidence if used
Barn/office → dwelling conversion with parkingCharge point, subject to £3,600 capQuote trail vs cap, or installation certificate
House extension, no new dwellingNot applicableTracker entry with reasoning

Common pitfalls that catch out sole practitioners

Frequently asked questions

Does every new house need an EV charge point?

Every new dwelling with associated parking within the site boundary needs at least one charge point — minimum 7 kW, compliant with BS EN 61851 and the smart charge point regulations, on a dedicated circuit. A new dwelling with no on-site parking has nothing to install.

Do domestic extensions or renovations trigger Part S?

A domestic extension does not. 'Residential major renovation' triggers Part S only where the building will have more than 10 parking spaces after the works and the renovation touches the parking or electrical infrastructure — rare in small practice work, but flat scheme refurbishments can qualify. Record the applicability decision either way.