Building Regulations Part J: Non-HRB Domestic Compliance Guide for Small Practices

Approved Document J — Combustion Appliances and Fuel Storage Systems · Building Safety Act 2022 · Non-HRB projects

Summary

What the Building Safety Act requires for Part J on non-HRB domestic jobs

Every stove, boiler, open fire and oil tank engages Part J. On extensions and refurbishments the recurring issues are: adequate combustion air (particularly once the house is made more airtight under Part L), flue routes and outlet positions that clear roof windows and neighbouring openings, hearth construction, and separation of oil/LPG storage from boundaries and buildings.

The interaction with ventilation is the safety-critical one. Extract fans (Part F) can depressurise a room and pull flue gases back down an open-flued appliance — AD J requires spillage testing where extract is added to a room containing an open-flued appliance. As Principal Designer (BSA) you should flag this whenever a kitchen extension with a powerful cooker hood shares air with a stove or open fire.

Installation by a HETAS/Gas Safe/OFTEC registered installer self-certifies compliance; otherwise the work must be inspected by Building Control. Either way, log the commissioning certificate and the notice plate details in your handover pack.

Key design risks and evidence needed (RIBA Stages 2–4)

Standards and references you should be citing

Stove installation compliance checklist

ItemRequirementEvidence to log
Combustion airPermanent vent sized to appliance rating (appliances >5 kW output in airtight homes need dedicated air)Vent calculation and location on plan
Flue outletPosition per AD J Diagram 17 relative to ridge/openingsRoof plan/section showing clearances
Hearth12 mm non-combustible (compliant stove) or 125 mm constructionalHearth detail drawing
CO alarmBS EN 50291, same room as applianceSpecification clause + commissioning record
InstallationHETAS/Gas Safe/OFTEC self-cert or Building Control inspectionCertificate + notice plate details

Common pitfalls that catch out sole practitioners

Frequently asked questions

Does a wood-burning stove installation need Building Regulations approval?

Yes — it is controlled building work under Part J. A HETAS (or equivalent) registered installer can self-certify and notify; otherwise a building notice or full plans application with Building Control inspection is required. The commissioning certificate and CO alarm are the key evidence items.

How close can a flue terminate to a roof window?

For solid fuel, AD J Diagram 17 requires the flue outlet to be at least 2.3 m horizontally from an openable rooflight, or 1 m above it if closer. Positions relative to the ridge, adjacent buildings and boundaries all carry their own dimensions — check them at design stage while the roof can still move.